Block G Central Park

Project Type

project type

Fit-out

Project Size

size

30,000 Sq ft
address

location

Dublin, Ireland

Timescale

timescale

4 Weeks

first landings

the client

Building G is an 8-storey office building extending to approximately 180,000 sq.ft. (G.I.A), occupying a prominent position in Central Park, Dublin’s most desirable and sought after office campus. The building is currently multi-let and is home to well-known occupiers such as Mainstream Renewable Power, MarketStar Europe and Sage.

The top three floors (5th, 6th & 7th) in Building G were presented in Cat A condition, providing accommodation from 23,887 sq.ft to 76,053 sq.ft. All three floors have been completely upgraded along with the lift lobbies, reception, toilets and the atrium area.

First Landings

the brief

The works are located in the Central Park office complex and within an occupied and live building which was occupied in the immediate vicinity of the works.
Works included Strip out and fit out of the 5th, 6th & 7th floors and refurbishment works to the Ground Floor reception.
The ground and lower floors of the building were occupied during the works to which access was maintained at all times.

3 Arena